Floor planning is the most critical work among all steps of the design process. It has to satisfy all special requirements, functional requirements by the owner, building code, and MEP (Mechanical, Electrical, Plumbing, and Fire safety space requirement.
āā
-
The floor plan affects the value of comfortability, work efficiency, and quality of architectural space.
ā
-
After the floor planning, Furniture selection, and custom furniture design, Material selection will proceed.
ā
āā
New York, NY
āā
ā
-
We provide 3D Renderings or Scale models to ensure total design control, including material and color.
-
For the case of a Single-tenant, an Elevator lobby will be designed. After the above steps, Mechanical, Structural, Sound engineer, and Health-related Specialist (as required) process the work. Schedule and Cost control. Construction document. Construction Administration. The closing of the project.